PLMA: Load Management Dialogues

7/30/2026 - Load Management Dialogue—Making Residential V2G Work in Practice: Turning a First Installation into a Repeatable Utility Process

PLMA: A Flexible Load Management Community Season 2026 Episode 5

Use Left/Right to seek, Home/End to jump to start or end. Hold shift to jump forward or backward.

0:00 | 34:53

Join us to learn how SDG&E supported a residential bi-directional EV charger installation coordinated by The Mobility House using a Wallbox Quasar 2 + 2025 Kia EV9. This partnership focused on working through complicated interconnection and permitting processes not originally designed for scaling V2G in the field. Our utility and vendor presenters will share their experiences and lessons learned, including replicable pathways for future residential V2G projects; permitting and interconnection workflows; required utility teams, critical stakeholders, and customer prerequisites; and the common constraints that limit installation eligibility.